Material Demonstration Project
Collaborator: Felix Joensson
St Marys
2026
We start with the site as the primary material source, conducting a reclamation audit of existing materials and identifying what natural resources are in abundance. From there, we shift out focus slowly outwards, examining the local town, then extending out to the bioregion. Once these three scales are exhausted, we turn to conventional material supply chains.
The resulting design gleans nearly 50% of its materials from the site, and only 35% sourced from outside the bioregion. Construction will get underway Summer 26/27.
1. Site
2. Locale
3. Bioregion
4. Beyond
Control, direct intervention, autonomy.
Daily travel envelope, community resources.
Distributed resource networks, industry, geology and ecology.
Everything beyond contextually meaningful local and regional networks.
What do we physically touch?
What is already here?
Where do everyday interactions, participation, and small-scale sourcing occur?
Where do core material systems, skills and fabrication networks operate? and what are they?
What must be imported or sourced from national or global systems?
Materials to be resued from the site: reclaimed timber and stone from a dismantled extension to the existing cabin.